- The hotel consists of two building the tower and the annex each had its own plant room.
- The project target was to get rid of one plant room and upgrade the second one.
- Redesign the chilled water piping system to be balanced after upgrading the plant room.
what we were responsible for results (by using One Plant Room):
- Performance Have Been Improved and the Complains of A/C Shortage Eliminated.
- Power Consumption Decreased.
- Water Consummation in Cooling Towers Minimized After balancing The Piping System and Adding Motorized Valves.