Nile Hilton Hotel

  • The hotel consists of two building the tower and the annex each had its own plant room.
  • The project target was to get rid of one plant room and upgrade the second one.
  •  Redesign the chilled water piping system to be balanced after upgrading the plant room.
what we were responsible for results (by using One Plant Room):
  • Performance Have Been Improved and the Complains of A/C Shortage Eliminated.
  • Power Consumption Decreased.
  • Water Consummation in Cooling Towers Minimized After balancing The Piping System and Adding Motorized Valves.
Sector EgyptHotels & Resorts Sector
Location Cairo, Egypt
Description Upgrading The Air conditioning Central plant.
Close